Selection Proposal Testing Machines
Scope, selection matrix, configuration, standards, testing, delivery and quotation terms.
01Scope
Match operating conditions to the recommended series, then confirm configuration with an engineer. Typical inspection tasks and how this product line solves them.
02Selection Matrix
Match operating conditions to the recommended series, then confirm configuration with an engineer. Operating ConditionRecommended SeriesWhy Max Test Force 10kN/20kN/50kN/100kN/300kN/600kNSpecifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. ,Specifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. PlasticsRubber, Thin Film, Electronics(HeightResolution)Specifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. OptionalHigh Temperature,,.Specifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. FAQ
03Standard & Optional Configuration
Standard delivery includes the main unit, control system, standard accessories and factory documents; options (motorised stage, image measurement, high-temperature module, custom fixtures) are quoted separately.
04Applicable Standards
National and international standards governing the method, calibration and acceptance. StandardScope GB/T 228.1Metallic Materials Room Temperature GB/T 229Metallic Materials GB/T 7314Metallic Materials Room Temperature GB/T 16825.1Testing Machine Calibration ISO 6892-1· ASTM E8/E8M FAQ
05Testing & Acceptance
Sample preparation, measurement, verification and acceptance criteria. Standard Operating Procedure GB/T 16825.1 classVerification,0.5 classIndication Error ≤±0.5%, 1 class ≤±1.0% JJG 762 Verification Acceptance CriteriaVerify with certified reference blocks: at least 5 evenly distributed points; indication error and repeatability must meet the applicable verification regulation. PrecautionsRun a pre-shift check with a reference block, keep the indenter and specimen surface clean, and recalibrate the measuring system periodically. FAQ
06Delivery / Installation / Training
Lead time is stated in the contract. Engineers perform installation, commissioning and operator training, with Chinese/English manuals supplied.
07Warranty & Service
12-month warranty (consumables excluded), lifetime technical consulting, spare parts supply and remote diagnostics; annual maintenance and verification contracts available.
08Commercial Terms
Pricing: this proposal contains no prices; configuration, price and lead time are stated in the formal quotation.
09Models in This Line
Pricing: this proposal contains no prices; configuration, price and lead time are stated in the formal quotation.