中国(上海)自由贸易试验区临港新片区老芦公路536号
021-57525860·13162862074
RANQIU · SELECTION PROPOSAL

Selection Proposal Hardness Testers

Scope, selection matrix, configuration, standards, testing, delivery and quotation terms.

Document No.RQ-SEL-HARDNESS-EN
Date2026-11-18
Models in This Line124

01Scope

Match operating conditions to the recommended series, then confirm configuration with an engineer. Typical inspection tasks and how this product line solves them.

02Selection Matrix

Match operating conditions to the recommended series, then confirm configuration with an engineer. Operating ConditionRecommended SeriesWhy ,, VickersSpecifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. Heat Treatment Vickers Rockwell(HRA/HRC)Specifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. Castings & ForgingsBrinellSpecifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. WorkpieceOn-Site TestingSpecifications are for reference only. Final configuration, price and lead time are stated in the formal quotation. RubberPlastics. Testing / MeasurementMotorized Stage Image Measurement VickersMeasurement.Specifications are for reference only. Final configuration, price and lead time are stated in the form

03Standard & Optional Configuration

Standard delivery includes the main unit, control system, standard accessories and factory documents; options (motorised stage, image measurement, high-temperature module, custom fixtures) are quoted separately.

04Applicable Standards

National and international standards governing the method, calibration and acceptance. StandardScope GB/T 230.1Metallic Materials Rockwell GB/T 4340.1Metallic Materials Vickers GB/T 231.1Metallic Materials Brinell GB/T 17394.1Metallic Materials ISO 6506/ ISO 6507 / ISO 6508 · ASTM E10 / E18 / E384 JJG 112Rockwell Hardness Tester, JJG 151 Vickers Hardness Tester, JJG 150 Brinell Hardness TesterVerification FAQ

05Testing & Acceptance

Sample preparation, measurement, verification and acceptance criteria. Standard Operating Procedure Verification: Reference Block 5,Indication Error Repeatability JJG Reference Block,IndentationMeasurementCalibration Acceptance CriteriaVerify with certified reference blocks: at least 5 evenly distributed points; indication error and repeatability must meet the applicable verification regulation. PrecautionsRun a pre-shift check with a reference block, keep the indenter and specimen surface clean, and recalibrate the measuring system periodically. FAQ

06Delivery / Installation / Training

Lead time is stated in the contract. Engineers perform installation, commissioning and operator training, with Chinese/English manuals supplied.

07Warranty & Service

12-month warranty (consumables excluded), lifetime technical consulting, spare parts supply and remote diagnostics; annual maintenance and verification contracts available.

08Commercial Terms

Pricing: this proposal contains no prices; configuration, price and lead time are stated in the formal quotation.

09Models in This Line

View All Models →

Pricing: this proposal contains no prices; configuration, price and lead time are stated in the formal quotation.

Hotline